Your Campus Doesn't Need to Rest. It Needs a Better Operating Model.

Posted By: David Sullivan Leading Up and Away,

For generations, independent schools have organized their campuses around a predictable rhythm: the academic year is busy, summer is quieter, and the weeks between are when the campus "rests." Buildings are cleaned, floors are refinished, projects are completed, and facilities teams prepare for students to return. That rhythm is changing and for Heads of School, CFOs, and facilities directors weighing how to strengthen the institution's financial model, it's worth examining why.

Independent schools are increasingly looking beyond tuition to diversify revenue, and the campus itself is one of the most significant assets available to them. Summer programs, after-school offerings, events, facility rentals, athletic partnerships, professional development, and community programs can extend the reach of the school while generating meaningful non-tuition income. Summer programs and facility rentals are already among the most common non-tuition revenue sources at independent schools. That raises the real question: what if we stopped thinking of the campus as something that operates on an academic calendar, and started thinking of it as a 365/24/7 institutional asset?

The Myth That The Campus “Needs to Rest"

Increased utilization is often objected to under the notion that "the campus “needs to rest." The truth is that buildings don't need rest. I think of that every time I go to the LL Bean flagship store 20 minutes up the road. For the better part of a century they have never closed. Open 24 hours a day, every day. They don’t even have locks on their doors.

Both people and facilities need maintenance, recovery, and renewal but those things are all manageable through design, not through closure. Like LL Bean, think about hotels, hospitals, airports, resorts, and conference centers: they don't close for weeks because the building needs a break. Instead, they design operations around continuous use: rooms, wings, and systems are taken offline strategically; maintenance is rolling rather than seasonal; staffing models anticipate evenings, weekends, and peak periods; replacement cycles reflect actual usage. While schools shouldn't try to become hotels, there is a real lesson in the operating philosophy: high utilization and good stewardship are not opposites. The problem isn't too much use, it's increased use without a change in operating model.

More Use Requires More Capacity

A school cannot add six weeks of summer programming, weekend rentals, evening events, and outside partnerships onto a facilities operation designed around a nine-month calendar and expect nothing else to change. Eventually, something absorbs the additional load. Often it's the facilities team through overtime and compressed maintenance windows. Sometimes it's the physical space, through accelerated wear and deferred maintenance. Faculty feel it too when classrooms aren't restored properly between uses. Auxiliary directors get caught between revenue targets and operational resistance (and sometimes blame). 

Increasingly, it's the labor model itself that is actually at fault. For example, custodial staffing built for a nine-month calendar doesn't stretch cleanly into a twelve-month one without new hours, new hires, or new contracts. This is why schools need to think about organizational capacity before demand. 

Instead of asking, "could someone rent this building?" ask instead "are we designed, staffed, and funded to have someone use this building?" Those are very different questions and a third belongs alongside them: "are we set up to control who has access to it and when?" Any increase in outside use of a K-12 campus raises access control, visitor management, and vetting questions that have to be solved structurally, not improvised on a program by program basis.

Not Every Square Foot Has to Work Equally Hard

Optimization doesn't mean maximizing every building every day. A more sustainable model treats the campus in zones:

  • High-intensity zones: athletic facilities, dining halls, theaters, select classrooms are all designed for near-continuous use.
  • Seasonal or limited-use zones: spaces that flex with demand but aren't built for constant turnover.
  • Protected zones: spaces with specialized equipment or academic needs where frequent resets aren't practical.

A science wing with sensitive lab equipment, for instance, might stay largely protected, while the gym and dining hall run at near-continuous use with a scheduling system managing rolling maintenance windows between bookings. Zoning concentrates wear instead of distributing it everywhere, and it creates natural windows to rotate spaces offline for upkeep. The goal isn't maximum occupancy, it's intentional utilization, supported by a scheduling and work-order systems that make rolling maintenance actually trackable rather than aspirational.

Follow the Real Money

Don’t confuse gross auxiliary revenue with financial contribution.

A $500,000 program is not necessarily a $500,000 success. Say a summer program brings in $500,000 in tuition. Once you account for custodial overtime, utilities, security, setup and reset labor, administrative time, and a reasonable allocation for accelerated wear and eventual capital replacement, the net institutional contribution might be $280,000. Still valuable, but a very different number to plan around. NBOA has long cautioned schools to weigh these often-overlooked costs when evaluating auxiliary programs, and more recent thinking on auxiliary P&Ls pushes further: allocate facilities usage, utilities, and administrative overhead the same way you would for any other cost center. It is important to know "how much revenue did this generate?" A better way to ask that may be “what is the net institutional contribution after we've paid for the impact we created?”

The Hardest Change Is Cultural

Optimizing campus utilization isn't primarily a facilities challenge, it's an organizational one. Faculty may need to shift from "my classroom" toward shared stewardship of institutional space. Facilities teams may need to move from protecting buildings by limiting access toward enabling use through standards, zoning, and planned maintenance. Auxiliary directors are expected to be revenue generators, but ideally are viewed as stewards balancing mission, margin, people, and physical assets.

From the top down, senior leadership must lead the change. Without their commitment and engagement, increased utilization turns into conflict among facilities, faculty, business offices, and auxiliary programs. With it, the friction of increased use pushes schools to build better scheduling, communication, budgeting, and maintenance systems– the same systems that make the zoning and cost-accounting above possible in the first place.

Where to Start

You don't need to redesign the whole campus at once. Three practical first moves:

  • Audit current utilization: which buildings and spaces sit empty most of the year, and which are already near capacity?
  • Build a true-cost model for one auxiliary program: pick your largest program and calculate net contribution (not gross revenue) using the framework above.
  • Pilot one zone: choose a single high-intensity space, put a rolling maintenance and access-control plan around it, and use what you learn before scaling further.

The future isn't necessarily a campus that's busy every day of the year. It is a campus capable of being used well whenever there's a compelling reason to use it: designed, staffed, funded, and secured to make that possible, and left stronger for the students who come next.